33 Pennwood Drive - Trail Project
January 2, 2004
TRAIL FROM THE HOME TO THE LAKE FRONT
Description: Construction of a foot trail from lake side of home to a natural utility area by the lake side approx length 502'
Trail will remain as natural as possible
Step areas and landing areas will be made from P.T. Timbers
Trail will be defined by a combination of hand grading and stone borders
Utility area will be hand graded and leveled using indigenous rock and soil
with some imported gravel
At the top of the trail there will be some limited planting bed construction
to include some shrubs, boulders and mulch
Subscribe to patrickWeb (receive a short email when a new story is posted)